Installation Process
See how easy and quick it is to enjoy a Pettit Fiberglass swimming pool
Step 1
Once the pool has been manufactured
in the factory, it is transported to the
location where all digging and
groundwork has been completed.
Step 2
The pool is then lowered into the
already excavated land, which
has been dug to engineering
standards.
Step 3
After backfilling the dirt and raising
the water level
in the pool, the pump and filter
are then connected usually
within 2 days.
Step 4
After necessary inspections, the deck
is poured and the screens
are erected while the water chemistry
is balanced. Normally within a
month, you can jump in.